All Star Baldwin Park Concrete

Concrete parking lot building in Baldwin Park CA - a lot laid out for cars and people

Is your lot cracked, holding water or short on spaces? We plan and pour concrete that works for the cars and the people crossing it.

New rectangular concrete patio along a white brick house, bordered by lawn and garden beds.

What a concrete parking lot job covers

Concrete parking lot building in Baldwin Park means forming, pouring and finishing the pavement for a whole lot, plus the curbs and walks around it. That's all flatwork, our word for concrete laid flat on the ground. We're based in Baldwin Park and build lots here and in the cities around it, for shops, offices, churches and apartment buildings.

A lot differs from a driveway in more than size. It carries delivery trucks and a steady stream of cars, the stalls have to fit the space, and people walk across it between their car and the door. The plan has to cover all three.

The price moves mostly with the size of the lot, how much old paving and dirt has to come out, and what has to go back in for a solid base. The schedule depends more on whether the city has to review the plan first than on the pour itself. I come out myself, walk the lot with you and put in writing what's included and what isn't.

White concrete pool deck borders a blue swimming pool, with two dark lounge chairs beside it.

What a new concrete parking lot can fix

Cracks running every direction

Old lots often crack wherever the slab gave way, and those cracks spread and break apart under traffic. We cut control joints, straight grooves that give the concrete a weak line to crack along, so the cracks that do come land where we planned them.

Water that sits after rain

Low spots hold water, the base underneath softens, and the concrete over it starts to chip and break up. Before we set forms, we check where the water runs across your lot so the finished surface carries it away from the building and the walkways.

A lot that's hard to walk

We lay out the lot for the people crossing it, not only the cars, starting with the path from a parked car to the door. The surface gets a broom finish, a light texture dragged across the wet concrete so shoes have something to grip.

New lot, new layout or repair?

The first thing I sort out is which kind of job you have, because it changes both the paperwork and the plan. Building a brand new lot, moving stalls or changing how many there are, and just fixing cracks and repainting the lines are three separate jobs.

If the slab is mostly sound, a repair that keeps your layout is usually the smaller fix. If big sections are sinking or broken through, the base under them has usually failed and patching only buys time, so we talk about cutting those areas out with concrete cutting or starting over.

Some trouble near a lot calls for different work. Light poles, sign bases and low walls sit on concrete footings, and if the building beside the lot has settled and the pavement hasn't, that's a job for foundation raising.

What to settle before we start your lot

  • How the lot stays open

    Most lots can't just close, so we decide ahead of time which sections go first and where cars and people go in the meantime. Working in sections takes more planning, but it keeps your tenants and customers parking while we work.

  • Where the money goes

    Nobody sees the base on pour day, so it's the first thing people want to trim. I'd spend there before the surface, because if the subgrade, the ground the slab sits on, isn't dug out and packed, the concrete settles with the dirt and cracks anyway.

  • Pour day and timing

    We schedule the pour for the cooler part of the day where we can, because concrete finished in midday heat can end up with a weak, dusty top. We'll tell you when we plan to pour and cut the joints, because joints cut late let cracks pick their own spots.

Building a parking lot in Baldwin Park

Baldwin Park reviews lot design along with the project's building or development permit, and every lot follows the city's design standards. Where the project requires four or more spaces, a new or changed lot needs a site plan sent to the City Planner. We find out which office handles your address and take care of permits as part of the job.

When owners call us about a lot, it's usually an older surface that's been patched too many times, water that sits in the same low spots, or the hope of getting more spaces out of the same ground. Tell us what's there now and how people use it. We do the same work in West Covina and El Monte.

Questions owners ask about concrete parking lots

How much does a concrete parking lot cost in Baldwin Park?

Concrete work in the Los Angeles area usually costs about $6 to $20 per square foot, and that's the going rate around here, not our price. Where your lot falls depends on how much comes out, the base it needs and the curbs and walks that go with it, so I put your number in writing after I walk the lot.

How long does a concrete parking lot last?

A concrete lot can give good service for many years with little maintenance, according to the concrete industry's parking lot guide. How long yours lasts comes down mostly to the base under it and whether the joints go where they should, so that's where we put the work.

Will my new concrete parking lot crack like the old one?

It can still crack, but joints cut into the pavement make the cracks form at planned spots so they don't wander across the lot. We lay out the joints before the pour, so you know ahead of time where any cracks are expected.

Who issues permits for a parking lot in Baldwin Park?

The city's Building and Safety Division issues building permits, and the Engineering Division issues the grading permit that has to be in place before grading starts. The city's grading notes say that permit goes to a licensed civil engineer once the grading plan is approved, so check with the Engineering Division for the current steps.

Do I need city approval to restripe or change my parking lot layout in Baldwin Park?

Restriping with the same space layout doesn't need parking plan review in Baldwin Park. Neither do fixing holes and cracks, resurfacing, or repairing damaged curbs and planters. Changing the layout or the number of stalls does need a zoning clearance from the city, so if you're adding or moving spaces, build that step into your schedule.

What license does a concrete contractor need in California for a parking lot?

California's Contractors State License Board has a concrete contractor class, and it covers pavement and flat concrete work like a parking lot. We're licensed and fully insured, and I'm on site running our crew when the work gets done.

Tell us about your concrete parking lot

Send the lot size, the number of spaces and any layout changes. We'll reply within one business day to set up a free estimate at your property, no obligation.

(626) 412-8829

Mon–Fri: 6 AM–11 PM, Sat–Sun: 7 AM–11 PM

Ready to talk through your parking lot and get a free estimate in writing?

Call(626) 412-8829